Model NO.: QJF
Function: Waste Copper Wire Recycling
Power Support: Electric
Power: 11.92kw-75.4kw
Voltage: Customized
Output: Clean Copper Pellet & Plastic Pellet
Trademark: Jingliang
Transport Package: Container & Ply Wooden Case
Specification: 11-75KW
Origin: China
HS Code: 84798190
Features: 
This copper wire granulator is designed for recycling scrap copper wires and cables such as automotive wires, communication cables, and other types of copper wires to recover valuable copper. The machine consists of a crusher, crushed material channel, vibrating separator, air blower, dust collector, and underbed, among other components.

Application: 
The copper wire granulator is used for crushing copper cables and separating the copper from the plastic sheath. It is ideal for processing various types of copper wires including those found in vehicles, telecom systems, and industrial equipment.
Applicable copper wires: 
2017 Brand New Copper Wire Granulator for Sale 
2017 Brand New Copper Wire Granulator for Sale
Processing Procedures:
  1. Copper wires and cables are fed into the crusher where they are broken down, and the plastic sheath is separated from the copper. The size of the crushed material depends on the mesh size of the screen; larger meshes result in longer pieces and higher output. The appropriate mesh size should be selected based on the type of material being processed.
  2. The crushed material (a mix of copper granules and plastic pieces) is transported to the separator via a conveyor. During this process, dust and lightweight plastic fragments (such as fibers, ropes, or tapes) are collected by the pressure-reducing blower. The blower is connected to a dust collector with a dust collection bag that prevents dust emissions, ensuring environmental protection. When the bag is full, the collected dust and plastic fragments are removed.
  3. The separator is used to separate plastic pieces and copper granules based on differences in physical properties and specific gravity. By adjusting the speed of the conveyor and vibration amplitude, copper granules (with higher specific gravity) move to the bottom and upward, while lighter plastic pieces move to the top and downward, eventually being discharged through separate outlets.
  4. All components are mounted on a base structure, forming a complete unit. The machine is pre-adjusted before shipping, so customers only need to connect it to a power source to start production.
Technical Parameters: 
Model  Recycling capacity Processed wire dia. Total power Voltage Dimension  Weight 
QJF-400-1 80-100kg/h  
 
0.3-20mm
11.92KW  
 
Adjustable
1.5*1.5*1.9m 750kg
QJF-400 200-300kg/h 23.12KW 2.7*1.9*2.3m 1200kg
QJF-600A 300-400kg/h 48.36KW 4*1.85*2.4m 3400kg
QJF-600 300-400kg/h 52.36KW 4.3*1.95*2.4m 3400kg
QJF-800 600-700kg/h 0.1-40mm 75.4KW 9.1*2.3*3.54m 8000kg
   
Different Models:  
2017 Brand New Copper Wire Granulator for Sale
2017 Brand New Copper Wire Granulator for Sale
2017 Brand New Copper Wire Granulator for Sale
2017 Brand New Copper Wire Granulator for Sale
FAQ 
 1. Are there any quick-wear parts on the machine? 
The main wear parts are the blades and screens, which can last over 2 years. We also provide blade sharpening machines for maintenance.
2. What is the maximum continuous working time for the recycling machine?   
Typically, it can run for up to 10 hours per day.
3. Is the machine easy to operate? How many workers are needed?
We have designed a simple yet precise control system. For a single unit, one worker is sufficient. For a full recycling line, two workers are required.




 
 

Anti-wear Ring

Installation and precautions of track connecting rod oil seal
The installation steps for the track link oil seal are as follows:
1. Cleaning: Clean the connecting parts to ensure that the surface is flat, clean, and free of grease and dirt.
2. Oil application: Apply a layer of lubricating oil to the connecting parts for better installation.
3. Installation: Gently push the oil seal into the connection area to ensure that the lip of the oil seal is not damaged.
4. Positioning: After positioning the oil seal, press it with your fingers to ensure it is in the correct position.
5. Inspection: Check if the oil seal is installed correctly and ensure that the lip is not damaged.
The precautions are as follows:
Before installation, check if the oil seal is damaged. If the oil seal is damaged, replace it with a new one.
Before installation, ensure that the surface of the connecting parts is flat, clean, and free of grease and dirt.
3. When installing the oil seal, gently push in to avoid damaging the lip of the oil seal.
4. After installation, check whether the oil seal is installed correctly to ensure that the lip is not damaged.
5. During use, the condition of the oil seal should be regularly checked. If any damage or wear is found, the oil seal should be replaced in a timely manner.

Wear ring for excavator,For excavator track,For excavator accessories

Safe Seal Technology Co., Ltd. , https://www.sprsealkits.com