After the new tanker truck purchases, it needs a driving period. Each part needs time to run in. It must pay attention to the speed of the vehicle when it is used. It should not be too fast because the new car needs 4,000 kilometers under normal conditions, because only This can effectively extend the life of various components. 1: The speed of the tanker should not exceed 70 steps during the running-in period. (Do not exceed the speed of 70 kilometers per hour) 2: The new car must go for maintenance when it reaches 2,500 kilometers. It is free for the first time. For gear oil, oil, three-core, this is very important, the first time the gear oil and oil replaced there are subtle iron pins running down, without any damage to the engine. After every 4,000 total six to change the oil and three cores. The new car will work well for a while. 3: The vehicle can't run at constant speed without adding any metal anti-wear to the vehicle. 4: Idling speed must be lowered at the start and the water temperature during driving needs to reach 80-90 degrees Celsius. The shift should be timely and cannot be used for a long time. If the high-end low-speed or low-speed high-speed driving is not conducive to running. 5: After the tanker starts, it should be warmed up. After the water temperature reaches the starting temperature, it starts again. To choose a good road during driving, keep driving at a moderate speed, and use a small throttle to avoid sudden acceleration and sudden braking. 6: Another point is that the new car is not suitable for other people's trailers, because the new car will worsen the damage of the engine and will deform the frame of the car.
Ready Concrete Batching Plant consists of 9 sections, aggregate weighing and conveying system, cement weighing system, water weighing system, additive weighing system, mixer system, dust removal system,pneumatic system, computer control system and Cement Silo. The modular design to make quickly installation and relocation; the fully automatic control system to make easily operation and reduce the civil workers; the external packing of the mixing tower and main conveyor to reduce the dust and noise emission and looks beautiful. HZS series Ready Concrete Batching Plant including the model of HZS60, HZS90, HZS120 and HZS180.
Main Features of Ready Concrete Batching Plant :
a. all separate weighing to make sure fast dosing and high accuracy
b. production capacity guaranteed
c. easy to do maintenance, low cost and long life
d. modular design, can be installed fast and less welding on site
e. Impulse dust filter collect the dust and reuse it.
f. Double computer synchronized control, no-stop production.
g. Easy to save and print the report for customer or financial analysis.
Concrete Batching Plant,Ready Concrete Batching Plant,Stationary Concrete Batching Plant,Concrete Mixing Plant Zhengzhou SMART Machinery Manufacture Co.,Ltd , https://www.simamax.com