Engines Parts
1. Engine Parts have base engine parts and performance
Engine parts .
Base engine parts including Engine block,
Engine Cylinder , Engine piston pin Engine Water Pump , Engine Lub Oil Pump , Engine Starter Motor , Alternator
Yuchai Engine Parts Cylinder
Performance Engine parts incluing Engine
Cylinder Head, Piston , Piston Ring , Fuel Injector and Fuel Injector Pump , Engine
Crankshaft, Engine Camshaft, Engine Turbocharger .
Cummins Engine
parts Fuel injector 3054218
2. FAQ :
1. ) Do you
quoted OEM engine parts ?
We can provide price of OEM parts with high quanlity , if you do not
mind the original package .
2. ) If we did
not have parts nuber of diesel engine , how to solve ?
We have
engine systerm to looking for your parts number and find the price Of Diesel Engines and engine parts .
3. ) Which package for the engine
parts ?
Neutral package , Woodcase or wood pallet
.
4. ) How many
days of your delivery time ?
7-10 working
days from Qingdao or Tingjin port .
5. )Which
Payment method you will accepted ?
T/T, Westerunion, Paypal,Bank Transfer .
6. ) Which express
you will use ?
Feedex, UPS, DHL,TNT express
selected
Engine Parts Engine Parts,Cummin Engine Parts,Small Engine Parts,Diesel Engine Parts Jining Kunpeng Construction Machinery Equipment Co., Ltd , https://www.excavatorenginepart.com
The workshop self-check means that, on the basis of adhering to the pre-inspection of the class before the class, the in-class inspection, and the daily inspection of the installation supervisor, each workshop is regularly led by the workshop director to the workshop's technical management personnel to perform equipment and safety in accordance with the company's equipment inspection standards. The on-the-spot inspections were carried out on a one-to-one basis for the problems identified, the timely rectification of the rectification, and the timely summary of conditions that could not be rectified, and the functional departments arranged for the implementation of rectification measures.
The professional weekly inspection, which is led by the leader of a maneuvering department every week, conducts on-site inspection of 4-5 sets of equipment, focusing on the “low and old†and deep-level management of equipment in safety, equipment, and on-site management. Problems; the Ministry of Motoring also adopts a combination of weekly inspection and subcontractor inspection of professional engineers to increase the management and assessment of on-site management, such as increasing the management of "clean materials after the completion of materials, and regularly organizing relevant professionals. To inspect and evaluate construction quality and civilized construction, it is forbidden to arrange indiscriminately to ensure that the construction site is clean and tidy.
The monthly inspection of functional departments means that the motorized department takes the lead every month to organize a large-scale inspection of the company's production equipment and equipment, focusing on equipment operation, spare equipment in good condition, lubrication management, on-site management, etc., and distinguishes the identified problems and implements rectification. Measures, strictly in accordance with the economic responsibility system assessment.
The supervision and inspection of the propaganda department means that every time the reporter of the Publicity Department inspected the interview video, the phenomenon of “low-quality and old-fashioned†on the spot was exposed on the centralized dispatching meeting on Monday; the on-site problem of the installation was more prominent, and the head of the unit made a review at the meeting, and At the same time, it reported on the situation of rectification; it strengthened its performance appraisal, pursued the management responsibilities of relevant leaders, strengthened the assessment on the level of production management, continued to dig deeper management issues, and received the results of reform and reform.
Due to the adoption of four-integration inspection measures, closed-loop management was implemented, which effectively promoted the continuous improvement of the on-site management level of the installation and laid a good foundation for safe production.
Yanzhou Petrochemical promotes the four-in-one combination of self-inspection by grassroots units, weekly inspections by professional groups, monthly inspections by functional departments, and supervision and inspection by propaganda departments, continuously intensifies equipment and on-site inspections, improves inspection quality, and strengthens service functions of functional departments. Improve the operation of the equipment and on-site management.